What is the difference between first angle projection and
third angle projection?

Answer Posted / zakiir rahman

THE MEANING OF FIRST ANGLE METHODE IS WHILE WE DRAWING A
OBJECT THE FRONT VIEW IS LIES TOP OF THE AXIS AND TOP VIEW
IS LIES BOTTOM OF THE AXIS
THE MEANING OF THE THIRD ANGLE METHODE FRONT VIEW IS
BOTTOM OF THE AXIS AND THE TOP VIEW IS ABOVE OF THE AXIS

Is This Answer Correct ?    77 Yes 21 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?

1864


how much cement and sand required for 1cum rr masonry

4517


115mm thickness brick work how to required mortar

1619


How many bricks are there in 100cft?

824


what does the track parameter mean in staad.pro?

5444






In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

1796


01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.

5042


how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6

1008


what energized you to complete your course?

1869


What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?

1767


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

1785


how many time use of plywood shuttering and IS code

2682


What is the Maximum %age of Steel in columns and beams ?

709


Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..

1517


what is the basic difference between Coloumn & Shear Wall

1665