What is Bearing Capacity of Soil? How will you calculate
for a particular type of Soil?
Answer Posted / saravanakumar.p
gross pressure intensity at the base of foundation at which
the soil fails in shear.
| Is This Answer Correct ? | 13 Yes | 3 No |
Post New Answer View All Answers
What year was the keystone power plant in Indiana County constructed?
which has high compressive strength between hollow block and brick masonry?
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
how to control PQI (Project Quality Index)
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
pls tell me , what is the water content
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
how to calculate the chair reinforcement length in slabs, footing or anywhere??