Answer Posted / ashokareem
It is working as a Swicth.If the voltageecced the rating
capacity automatically the fuse connector is got burn(OFF).
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What is the lockout relay
What are reasond for high wattage in single phase induction motors
How cable from Kit-Kat to main switch, from starter to motor are designed?
If we connect a motor and generator together (I mean that the generator gives the motor electricity and the motor gives the generator movement) regardless the losses. Will the generator still generate and the motor still move?
how ceiling fan worked?
What is stepper motor?
How to calculate loses in transformer of 160 KVA ?
pls tel me the electric train traction motors name plate details like rpm,torue,voltage,amps,watts..ect..
any body,pls tell me how to done relay coordination ? how to coordinate by TCC curve?how to read the tcc curve?
What is the Resposiblity of Electrical Utility Engineer
in india per day how much power is generated including all power station
if there are six generators (3 gas CATT, one Jenbacher o1 MW each, and two nos Diesel 01 no 01 mw other 0.65mw EDGs ( say), 3 CAtt gas set have identical pole pitch,01mw EDG and Jenbacher gas Set have different pole pitch, how their power connection can be done to connect a common bus bar during installation. in short, how different pole pitched generators power connection can be done to connect a common busbar system through generators incomer ACBs.
what is the difference between circular wdg & ractangular wdg?
How to decide CT & PT ratings for a given transmission line carrying some rated voltage?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.