Answer Posted / raghavendragovinda
A-10mm
B-12mm
c-16mm
| Is This Answer Correct ? | 15 Yes | 1 No |
Post New Answer View All Answers
why the profile of shell of natural draught cooling tower is hyperabolic.
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
Define What is Civil Engineering?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
how much repeitation for conventional and maivan formwork?
What is the procedure of concealed plumbing in toilets?
which formula used for calculate the area of segmental arch?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
Is there any course for billing available in Mumbai? If yes then please mail me the details..
What difference comes in constructing of house and a housing complex like society
what is the painting co efficient of slope roof tiles?
What is different between DI Pipe and CI pipe?