i have a bar of 20 and 16, lap length is 48*dia of bar,
what is the lap length here
Answer Posted / harish
As per ISO 50 (d)2
Is This Answer Correct ? | 0 Yes | 5 No |
Post New Answer View All Answers
How to arrive dry volume of concrete (1.52 to 1.57) ?
What are the steps involved in the concreting process?
What is the strongest bridge for a school contest?
construction workers how much time take one work or qty
Minimum concrete cover in slabs, columns, beams, foundation and other st?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
what is the design procedure for building
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
How we calculate the service time of buildings
The concrete slump recommended for beams and slabs; is?
What are the different methods for drawing an arc?