if water absorption is more than 25 percent in brick, what
is the defect in it?
Answer Posted / sagar sontakke
If water absorption is more than 25 % in bricks,it will
absorb the water from the mortar,making mortar dry.so
mortar will become weak and so the massonary.
| Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
What things you need to take care of before building a kitchen island?
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
what is the difference b/w full length and cutting length?
Formula for calculation volume of essentric footing
what do you understand by M25 concrete
What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.
how can we calculate steel value, depending on load
Will water damage concrete?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
Explain different types of rcc pipes.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how many material required for brickbat water proofing of toilets.
how to preaper for interview wat they asked in interview give me idea
how do you stabilize a waterlogged area in road construction