what is the diffrence of opc and ppc cement ? expailn
Answer Posted / ajaya kumar rana
OPC stands for ordinary Portland cement.these are
traditional cements obtained by proper grinding & processing
of argillaceous & calcareous materials in rotary kiln.
PPC stands for portland pozzolana cement.Portland Pozzolana
Cement is manufactured by blending pozzolanic materials, OPC
clinker, and gypsum either grinding them together or
separately. Today Portland Pozzolana Cement is widely in
demand for industrial and residential buildings, roads,
dams, and machine foundations.
Is This Answer Correct ? | 27 Yes | 5 No |
Post New Answer View All Answers
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
Is it possible to make a feature using an overdefined sketch?
how to check and keep control on the wastage of material at site
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
Which code is used for tor & tmt steel bar?
What is the difference between engineering stress and true stress?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
what is the calculation of raw material for 0.35cum of m-15
What is the outturn of Ceiling plastering
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
mix design procedure for 1:6 cement mortar