Answer Posted / ajaya kumar rana
BOQ is a document used in tendering in construction
industry, which indicates quantities of various
works.Tenderer has to quote rates against given items in
BOQ. Rate should include cost of materials, machineries &
labours required to do that work.
Is This Answer Correct ? | 20 Yes | 2 No |
Post New Answer View All Answers
what pressure the NP2 class RCC pipe can sustain?
What is horizon or horizontal mining?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
what is Brick crushing strength(PSI)?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
What are the joints wants to made in masonry where door opening, arches like etc..
What is the difference between absorption & adsorption and sorption?
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
what is the breaking strength of wall tiles
RR masonry rate analysis
All aptitude question of Bechtel
what is castigliano theaorem
Will going from a 3-tap to 6-tap increase water pressure?
What is the difference between engineering stress and true stress?