BOQ is a document used in tendering in construction
industry, which indicates quantities of various
works.Tenderer has to quote rates against given items in
BOQ. Rate should include cost of materials, machineries &
labours required to do that work.
| Is This Answer Correct ? | 20 Yes | 2 No |
Post New Answer View All Answers
What is geopolymer based concrete?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
which steel is better for residential building tmt steel or hysd steel
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
How can i do RCC rate analysis?
how many kg of 20mm, 10mm, dust available in one ton stone boulder
What expenses counted in contingencies and how much it is in related to built-up area of the building.
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
What are the advantages of cad software’s?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
How to calculate Volume of Wet cement concrete for a specific grade?
What is the difference between absorption & adsorption and sorption?
what is E
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument