Answer Posted / ajaya kumar rana
BOQ is a document used in tendering in construction
industry, which indicates quantities of various
works.Tenderer has to quote rates against given items in
BOQ. Rate should include cost of materials, machineries &
labours required to do that work.
| Is This Answer Correct ? | 20 Yes | 2 No |
Post New Answer View All Answers
What are the uses of groynes?
rimmer in pile foundation
how clculate excavated or backfilling quantity by simpson's rule
What is progress payment?
What is the l/d ratio of cantilever beam?
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
What is labor and material payment bond?
What Reinforcements Are Used In The Process Of Prestressing?
What are the ingredients of pre-stressed concrete?
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
Explain the difference between shear and tensile strength.
what is diffrence between catchment area,watershed and basin?
Explain moment of inertia and its importance.
How do you prepare Material Recovery Statement for deduction from contractors bills?