Answer Posted / ramprasad. s
HI
Mutation : What is Mutation ?
Change in Order (Can be Software code or
Genetic Code).
Mutation Testing: Change the Existing Software Code(Normal
Functionality) Through mutation & Test The Application.
Result: The Application Should show Bugs while Text
Execution.
S.Ramprasad.
Any Commnet sun_ramprasad@yahoo.com
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
Hi can anyone help with projects using load runner. I learnt loadrunner but don't have a hands on experience on it.. it will be very much helpful if some can help me up with a project. can email me: priya.joslic@gmail.com
What is the configuration of systems when using load runner?
What is the significance of “vuser-init “?
How can we perform functional testing under load?
How to schedule a scenario?
What is the use lr_abort function?
Which are online monitors and windows resource monitors
Hello Friends, Can anyone please let me know about Performance testing health care EDI ( 270,271, 835 ect). I need as detailed answer as possible. I am going to use LoadRunner for load testing. I would really really really appreciate your help. Thanks, Piyush
You want to have each step in your script measured as a transaction in the controller and not shown in the replay log in vugen. How can you accomplish this?
What is vuser script?
How do you enable text and image checks in vugen?
How you identify performance test use cases of any application?
What do you mean by path?
What tools are required to analyze vuser run results?
How is automated correlation configured?