Answer Posted / aniket singhwal
a)According to Voltage
1)Step-Up transformers
2)Sttep-down transformers
3)Auto transformers
C)BASED ON THEIR CONSTRUCTION OF CORE
1)CORE TYPE
A)Air Core transformers
B)Iron Core transformers
C)Ferrite Core transformers
2)SHELL TYPE
d)further based on phase as,
1)1-phase
2)3-phase
| Is This Answer Correct ? | 7 Yes | 4 No |
Post New Answer View All Answers
Can any one know what are the symbols at the down (below) the analog ammeter??? there are 4 symbols which are they ?????
what is the interrelation between voltage current torgue speed and magnetic flux in case of different types of electric motors
A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.
What is the Designing & Selection Procedure for a DG/Transormer of rated capacity?
Dear All, I am new in construction company , my boss ask a question at time of interview , If we have 60MW generation and Single Power Transformer step-up we have. if CMR 50/60MVA , ONAN, ONAF respectively , is it sufficient or not ? for that much power to transfer,
what percent do you derate your copper wire when you change from copper buss to copper wire
what is the difference between oil surge relay and buchholz relay.
Why does increasing the magnetic flux in the main field of a d.c motor cause the armature current to reduce??
May I know how much values to be set for earth fault, over current and short circuit values at 11kv side? I have 11kv van 1250amps rating. Present it's taking load 80amps?
can anybody send the rrb chennai &rrb bopal question papers of 2006&2007.My exam is on 12 oct 2008.Its urgent
What is the criteria that generally follow by distribution licenses to fix contact demand of their industrial customers?
when elecromagnatic waves are propogated in a wave guide?
How to know vacuum in vacuum cylinder of breaker in working condition
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
Explain the operation carried out in thermal power stations?