what is the advantage of NiCd battery over Lead acid battery?

Answer Posted / c.hari balakrishnan

Nickel cadmium batteries are maintenance free batteries
and cost is high comaparing to lead acid batteries.
Sulphation formation is not so much frequent in NiCad
batteries,But in lead acid batteries regular maintenance to
be done.

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the specifications for conducting earth leakage test as per IEC standard?

1523


what is the use of surge suppresser in 33 KV incoming panel. where it must be installed,inseries with incoming cable surge suppresser must be at incoming of the breaker are outgoing of the breaker

4555


When we connect the large capacitor bank in series ?

617


In a voltage-controlled current source A A current booster is never used B The load is always floated C A stiff current source drives the load D The load current equals Isc

1431


any earth foult trip the relay but in welding time not trip by earth foult

2734






Why the unit sizes of hydro generating machines are not standardized as in case of thermal powerplants?

622


What is an automatic controller?

654


What is your acheivements

1679


which protection function should measure RMS value of current&DFT value of current?

1485


What will happened if the neutral of secondary of Xformer ( Star point) Note it's above KVA rated Xformer

1423


WHAT ARE THE CHARACTERISTICS OF AN VOLTAG AMPLIFIER

1606


What is the RMS and DFT principle of analogue maesurments. Which way they are advangages. where which princples give optimum results.

2177


can we find the inductance of a induction motor?

1559


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2385


Can you explain about Restricited earth fault protection scheme

1412