Q:What is the formula of bar to bent the slab in bent slab?
Second question Q: what is formula to calculate the hook?
Answer Posted / girish rawat
The bent up for end slab is L/7.
for continuous slab it is L/5.
For hooks it is 7x dia for each hook
Is This Answer Correct ? | 16 Yes | 3 No |
Post New Answer View All Answers
insted of bentonite we can use any alternate material in piling ?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
what is tension & compression of steel bending.
What is the difference between built area and super built up area?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
What is binding spacing of the rebars at lapping zones.
How is the strength of cement measured?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
How to calculate steel for beam slab and column
How many cement sand ballast in cc 1:4:8 40mm
what is the mode of method of face bar measurement