Why at the starting of induction motor current is high?
Answer Posted / sunil guru
AT START THEIR EXIST MAGNETIC FIELD & THE ELECTRIC FIELD IS ABSENT AND COMBINATION OF BOTH PRODUCES THE TORQUE AND ROTATES THE ROTOR...
TO PRODUCE THE FLUX IN THE CLOSE CIRCUIT OF THE ROTOR MOTOR CONSUMES THE CURRENT AND WITH THE CUTTING OF FLUX EMF IS GENERATED THEN THE GENERATED EMF IS CALLED BACK EMF OR COUNTER EMF .... AFTER THE PRODUCTION OF BACK EMF IT NEUTRALISE'S WITH SUPPLY VOLTAGE AND THEN WITH THE STAGE OF NORMAL RUNNING OF MOTOR THE CURRENT CONSUMPTION REDUCES...
SO AT START WITH THE WORK OF SETTING OF FLUX AND TO OVERCOME THE LOSSES THE STARTING CURRENT IS ALWAYS HIGH...
FOR ANY DISAGREEMENT MAIL ME AT parmar20072008@yahoo.com
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
What do you mean by turns ratio of instrument transformer?
What are the advantages and disadvantages of closed-loop control system?
How a capacitor discharge weld power supply works? what is the use of a pulse transformer?
Name the types of motors used in vacuum cleaners, phonographic appliances, vending machines,refrigerators, rolling mills, lathes, power factor improvement and cranes.
why we use ac supply as 415 volts instead of 415 v why we cant apply 230 v for dc
If a rotary UPS is in line through grid power; What would be the impact on Power Factor if the load through rotary ups is 25% , 50% , 75% & 100%. Will the power factor reduce with less load?
what is a synchronizing lamp ?
if field breaker of generator is closed prior to its rated speed on a power generating unit. what will be the effect on generator, unit transformer and starting transformer.
How to calculate earth fault current for 6.6 KV , 50 HZ , 756 Amps , 3000 RPM , 0.8 PF generator
A parallel flow heat exchanger will perform better than a counter flow heat exchanger. State if the statement is true or false.
I meggared my 2c*70 sq mm AL AR XLPE cable. its one end show 50 M ohm . is my cable is safe for laying. I have only one phase and neutral.
In Power cable specification what is U0/U and Um.
what is d check in dg 1500kva
Is it required to lay 2 runs of GI wires along with armoured cables from one power DB to another Power DB?
what is meant by vector group of a transformer? How can it be derived?