Answer Posted / sjtbehera
1. under rimed pile
2. rigid pile
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
how gradation of aggregates effect on slump of fresh concrete?
what is called Bulk Density of aggregate?
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
I need old MMUP exam question and answer for Civil engineering
How much cement will require for 1Rmt Skirting laying
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
how to calculate spacing rod in column
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
WHAT IS YOUR CURRENT SALARY
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
How to find out kg per Sft ?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
What is the diff between cad & cadd?
Explain the mechanism of cavitations in pipes and drains?