Answer Posted / rasa
server room basically houses delicate electrnic equipments.
Earthing requirements of the server rooms is basically
governed by the recommendation of the equipment
manufacturer of the equipments located in server room. This
is basically electronic earthing.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
why 15 kw motor winding resistance is low then 5 kw motor winding resistance?
Please brief what is sinewave
Why we use duplex coil and hook switch in telephone system?
If not into production, how far did you follow the design and why did not you see it into production?
Sir 33kva 2 transformer load 900 amp calc 1800 amp mana jayega
List out the different frequency domain specifications?
please write motor, transformer, Generator setting, fault level calculation of Tr.etc
Does outdoor isolator loose connection cause short circuit current in that circuit? if yes then how ??
What is the difference between rulling span and wind span of of an Over Head Transmission Line?
How Calculet The UPS AH In Load
If two Transformers are connected in parallel having impedance of 50KA in both transformers will the impedance increase or decrease after connecting transformers in parallel?
What is pole of the system?
what is difference between speed mode and torque mode in motor?? explain in simple words please.
What is the limitation of kirchoffs law?
75 kw motor take 45 amp in no load delta in star 10 amp but in load it will take 160 amp but IR velue of winding above 500 at 1kw ph to earth and ph to ph. what problem it should be?