Answer Posted / rasa
server room basically houses delicate electrnic equipments.
Earthing requirements of the server rooms is basically
governed by the recommendation of the equipment
manufacturer of the equipments located in server room. This
is basically electronic earthing.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
i want some interview related questions with their answers which can help for attend the interviews...
why we are not giving the zone 1 trip command to the master trip relay
what is inverter and converter
what is integrated ac contact circuit
difference between crane drive and line drive.
Define cuttoff frequency?
Yazaki india pvt ltd interview questions qurey related
When are the directional relays used?
Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir
Why 15Amp. MCB is suitable to carry load of 1.5Ton Ac please Explain?
A 1F capacitor is charged to 100V initially. A 1H inductor is connected accros the capacitor througha a switch. The current in the circiut when the switch is closed is____
Define non-touching loop.
What is dc current source?
How does a battary stores charge in it? please explain in simple manner and in detail.thanks
Hi,I am working in abroad for more than 3 years in a company operating with 11kv and 6.4 MW power. I need c licence in India,can I? some other says only i can get if i work for 2 years in india only! anybody kindly clarify by doubt.Thanks