Answer Posted / rjendra
Normally developpers those who have developed the code are
responsible for the code testing.
This is called as "debugging".
Normally a developper will be asigned for certain module to
development.
The module is composed of units or code blocks.
So the developper starts coding the code blocks and
integrates the code blocks into Module.
You can view this this code block as each individual
component of the Module.
After development of code block/unit/component the
developper starts testing the unit/component,this is called
as Unit testing.
After completion of unit/component testing the the
components are integrated in to one module.
THis low level Integration is called as Component
Integration.
After this developper conducts compoenet integration
testing on the entire module.
byeeeeeee
friends
rajendra_penumalli@yahoo.com
hyd
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
please anyone let me know the -ve testing of Excel sheet?
What are the factors affecting a manual testing project and what are the ways to overcome it?
What Is risk Based testing?
What’s the difference between verification and validation in testing?
i have 2.5 years of experience in manual testing and qtp. can anyone say me what kind of questions do they ask on manual testing and qtp.
Please Provide me the link to download Testing Category questions and answers If some body has downloaded it pleae send it to me Pavan : Email pavan_cd@yahoo.com Quetion2 : Can any body Explain me about Testing thumb rules
Explain the advantages of automation over manual testing?
How can we test for drastic (severe) memory leakages?
Have you ever completely tested any part of a product? How?
What are the phases involved in software testing life cycle?
Can you explain tailoring?
What does you mean by positive and negative testing & what is the difference between them. Can anyone explain with an example?
What is Registry?
When the GUI Testing will be held on the V model ?
What is test startegy?