Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to select a breaker (MCB,MCCB,ELCB) for 18.5 kw, 3 ph.
480 v, 60 hz induction motor?

Answer Posted / jayaraj

P=Sq rt 3VI pf
So I = 27.8 Amps. considering the staring current twice as full load current = 55A so 63 A MCCB required. Depends on the KA of the system 25KA or 50 KA MCCB can be selected.

Is This Answer Correct ?    13 Yes 17 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the alternate solution for testing of polarity by using polarity tester while its milli ammeter does not works?

2014


which IS or IEC is used for earthing,breakdown voltage of transformer oil, hv/pd testing and all type of electrical testing

2590


How Can you do Maintenance of ACB of 2000Amperes

2054


Define step response?

1144


If oil and air can withstand a high MeV when used as an insulator in a transformer, what are the values of how high for each material?

1855


How grounding is different than earthings?

1143


Is there any guideline say about display of earthing value near to earth pit

1180


What is the power factor of an alternator at no load?

1313


How do the synchronizing lamps indicate the correctness of phase sequence between existing and incoming alternators?

2160


how ceiling fan worked?

1893


What is Auto Mains Failure Panel & Auto Synchronizing Panel

1916


234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,

2004


Define delay time.

1073


Difference between transition and diffusion capacitance

2954


how to find out cable size if load is 2800 watts, 230 volts AC supply and load distance is 1800 meters

1596