Cost control in civil construction as well as Quality control
Answer Posted / ravindran
provide flyash or GGBS in concrete to replace for cement
if specified in Technical specification,avoid maximum
watage of concrete and other materials,utlize correct
manpower, using minimum cement content in concrete,proper
planning,Sheattering materials should properly stored and
used for more than 8 repetition
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
How to compute minimum number of columns required for a site from area of site?
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
what is smart building materials?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
What will be weight of 0.5mm GI sheet per sq.ft?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
Stringer How many cm goes to landind
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
How to calculate chejja reinforcement
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
Formula of mid span bar
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
What is the difference between a wood shake and wood shingles?
can you provide a link for manual design of building?