what is the maximum current carrying capacity of a 95 sqmm
cupper under ground cable laid partialy in land and
partialy in ground?
Answer Posted / sunil kaushik
130 A
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is cut-off rate?
we have a 2.5hp Starite electric motor water pump,the elec motor burned out,we need to replace starting capacitor(old capacitor specs erased),what microfarad rating capacitor do we need? 110-125V
I am going to appear for the RRB Chennai Section Engineer online exam. Please send me the question papers from 2001 to date to my mail id:upendrakrishna20@gmail.com,plz send me ,or send any other rrb papers plzzzzzzzzzzzzzzzzzz
what is the current setting for different relay protection for transformer .
is IS says that neutral should be brought to switch box. and this one is a recomended practice
What is pole of the system?
What is the use of lag compensator?
i have attended the interview on 4th June,08 at Kolkata in IOCL, can anybody tell me what is its result
We normally make oil soak pits under Transformers. Oil from soak pit goes to collection pit. We provide granules/pebbles under transformers. My question is weather granules/ pebbles to be filled in soak pit or not? if yes upto what level?
in ACB breaker requireding 3200Amps. buscoupler getting OFF mode and again it reset and getting normal position give me a required answer?
What is the formuala to calculate the rating of motor protection circuit breaker
What magnetic circuit is formed in berry-type constructions and why?
use of choke in APFC panels
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
What is the meaning of HT Trivector Meter ?