Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how do we find the nos of bricks in 1 m3 brick masonary

Answer Posted / raju gohel

brick size 22.7x11.4x7.6 (cm)
with 10 mm mortar joint its size 23.7x12.4x8.6
so brick nos = quantity of brick work/size of brick with mortar
=1/0.237x0.124x0.086
=395
quantity of mortar
volume of brick for one m3
=395x0.227x0.114x0.076
=0.78 m so volume of wet mortar is =1-0.78=0.22 m3
volume of dry mortar=0.22/0.80 =0.275 thus it is 0.3 m3
proportion : 1:3 cement=0.3/1+3
=.075
=2.14 bags
sand = .3/4 x4
=0.018 m3

Is This Answer Correct ?    19 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain major differences between routing maintenance and major maintenance.

1089


why do we not deduct volume of steel to find actual volume of concrete in practical???

1775


What happens to Load at yielding ?

1391


What is the software used in civil engineering?

1084


How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?

2243


is concealed wiring a problem in fly ash brick wall?

2516


The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.

2709


How to increase a bearing capacity of soil?

1116


why we use 19x9x9and 20x10x10 but not other

2149


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

2014


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3757


What will you do if you encounter problems like accidents?

982


how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing

2299


how find the cut length of tringular ring and any formula find out the quantity of circular brick work

6390


660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need

1610