how you calculate the qty. of cement ,sand,aggregate from
proportion 1:2:4 M15
Answer Posted / viplav
while using the proportion
Is This Answer Correct ? | 5 Yes | 12 No |
Post New Answer View All Answers
what is the name of shuttering oil used in oman
What are some structures that may be subjected to fatigue?
How to calculate chejja reinforcement
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
What is progress payment?
What is the purpose of Chipping in the heavy foundation?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is the steel difference between np-2 and np-3 pipes and weight also
How much cement and sand required for 9"brick wall per square metre
how to calculate the scour depth
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
can you provide a link for manual design of building?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?