what is the difference between electrical & electronics
Answer Posted / sachin
in electrical eng we study circuit and in electronics we
study the diode
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
how to select overload-relay for perticular motor 1.for D.O.L. starter 2. for Star-delta starter ????
15hp motor wound by 0.9mm & 0.95mm magnet wire. at no load test it draw 4.2A current. Another motor with same condition draw 9.2A current. How can that occur? pls help
What is pole of the system?
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
what is dry and wet frequency withstand voltage? why & where it is used??
What is the diffrence (Technical & Construction ) between CBCT & Normal CT?
What is stacking factor? What is its approximate value?
Explain the function and difference of Restricted earth fault, simple earth fault and sensitive earth fault with connection diagram.
Differentiate between real and apparent power?
i need to now what will be the cable size to the following load, transformer to distribution panel distance 110m, load 1000kw, voltage 400v, pf 0.85, permissible voltage drop 2.0%, overhead line, atmospheric temperature 35 degree c.
why -48 volts dc used in telecommucation
Can any body tell me the different types of LT cables & their application.
Compare salient pole and cylindrical rotor machines.
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
How can get elongation of 2 k.G aluminium, if elongated aluminium dia is 2.5 mm?