Answer Posted / rajlaxmigohel
h/9
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
What is the Unit weight of coarse sand (F.M- 2.20) ?????
What expenses counted in contingencies and how much it is in related to built-up area of the building.
How to design staircase.plz tell me formula for the design the staircase.
Discuss some applications of modular elasticity?
Slump Values for works?
Describe a time when you anticipated potential problems and developed Preventive measures
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
how to absorb to site basic corrections? which are the important correction?
what are the types of dimensioning?
What is the Hardness of M-40 grade concrete, general and theoratical
How to marking the building
What is the use of offset command?
What is the average density of soil?
Minimum concrete cover in slabs, columns, beams, foundation and other st?