Answer Posted / al_m@ster
It is the phase shift between HV and LV and normally HV is
a referance and LV has a phase shift.
Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
How we can calculate the life of Lead acid battery
What is the Surge suppresor? Why using in a UDB's and How it works?
What are the advantages of hydropower?
I Just want do EHS Certified Certification Distance Course From Govt approved,so can any body provide me details.
What will be the effect if I use inverter as UPS mood?
how much UPS neutral erath leakage current.
how you taken aotitude test
before synchronizing an alternator,power factor is leading ,why?
WHTA IS LIMT OF LEAKGE CURRENT OF 11 KV 1 CORE 1000SQ.MM. XLPE CABLE.LOAD ON CABLE IS AROUND 600AMP .LENGTH 500 MTRS.
Why we cant store an ac power. If we coo store in which device we can?
Why open circuit test of transformers is conducted at rated voltage??Why not any other voltage??
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
what is calculation mathod/formaulla for deciding Size of busbar (Copper/ aluminum)for L.T. panel on Various Fault level like 50kA,25kA,10kA
I have finish diploma electronics and five years experience in electrical field in ht service how can i get c licensce or other electrical certificate
in control scheme dc logic wiring commonly using negative loop,what is the reason?if we use positive looping what will happen?