Answer Posted / ponnuswamy balakrishnan
It doesn't matter which brand of PLC you are hanldling
with. You should know the basics of electrical circuits and
able to read circuit drawings perfectly. PLC perform the
programme what we write for a specific objective.If it
ackowledges the inputs signals ( Sensors,switches etc)it
will automatically give o.k for output( motors and
temp.controllers etc.).So first check the input & output
signals in the plc for the broke down circuit. If it is
o.k.then proble should be in the hard wire line. May be the
wire groundeded or the defective component.
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
What is the PLC configuration in Cement industry?
Where are oxygen analysers installed in cfbc boilers? What are their usual readings?
Hi Friends , i need one urgent help , i am preparing for M.tech entrance examination , i need some obejective questions related to instrumentation field. where can i get those ? can anyone help me pls ?
you are on site,the plant trips,you are approached by operations,what do you do?
A flange is used for instrument connection for a system with a design temperature of 316C (600F) and a design pressure of 1000 kPa (145 psi). What is the class rating of the flange to be used for this application? Explain your answer
I want measure the volumetric flow of gas in waste heat recovery Boiler?Tell me how and which type of instruments required. Plz mail me:naba02222@gmail.com Sam please post the answer .
Explain the difference between mmwc and mmwg?
centrifugal compressor interlock? Tell me the parameter at which compressor will trip
What is compensation for flow ? Why we use compensation ? What are the factors of different compensation ? We not use then what problems may happen ?
what is difference between fork type and capacitance type level switch. where it is using
A DP transmitter is used to measure the level of an open tank. The drain line of the tank is connected to a control valve, and is configured as, if the level of the tank is 90% the valve should get open 10%. And if the tank level is 10%, the valve should get open 90%. Draw wiring diagram and explain how to configure DP transmitter and control valve using HART communicator. If the span error at output is 1%, what will be the %opening of the control valve at 60% level of the tank?
How to control flow variations in magnetic flow maters..... When i will provide proper earthing?
what about your moleg in pogrees with company
what is different between 2,3&4 wire rtd and how much maximum distance using plc to field.
What is the cascade control