What is Meant by Load factor in Power plant?
Answer Posted / p.subash
Load factor for a power plant is the ratio between average
load and peak load and can be expressed as
μlf = (100) Pal / Ppl
where
μlf = load factor (%)
Ppl = peak load for the power plant in the period (kW)
| Is This Answer Correct ? | 18 Yes | 3 No |
Post New Answer View All Answers
why +24 v and -48 v give to BTS? If -48v protect from surge then why we not use -24 v?
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING) I O (current operating)?
What should be setting for alarm,tripping and cooling fan on for power transformer's oil temp. and winding temp. indicator?
What are factors to be considered while we selecting the Core Balance Current Transformer for Earth fault protection
If 22 KV HT line, Current transformer is 25/5 then how to calculate multiplying factor.
suri transmission
WHAT IS THE FORMULA FOR CALCULATING CURRENT RATING(DIRECT IN GROUND OR AIR) OF ARMOURED(XLPE) CABLE OF 4C,16Sqmm?
1.What is the range of stator resistance of 3-phase induction motor? 2.Two electrically operated vibro motors are foxed in parallel direction in vibrating feeders. what is the direction of both vibro motors?
which stabilizer is better ? AVR, Servo Stabilizer, Static stabilizer etc & why explain it
how to measure earth resistance of a substation
What is a compensator?
I am using submission of two ct in one and half scheme for 67/67N protection. Both CTs star point is grounded separately near ct box.Will two point ground give wrong tripping to 67/67N during fault or no matter.
Define demand factor?
How many double suspension hardware fittings are required on a double circuit transmission tower?
Please brief what is sinewave