I have seen the Temperature element (T/C & RTD) installed
in process line on 45 degree position, Why? What it mean?
How many types of tapping position for temperature elements?
Answer Posted / haridass
The temperature probes will be located in straight for the
pipeline medium temperature measurement,
but in the tank it can be only located at side of the tank
at perpendicular or 45 degree position (not straight),
if it is quiet perpendicular mean it can measure only when
the liquid reaches the probe level,
the 45 degree location helps to measure for the wide level
of the liquid in the tank.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
For crude application in floating roof tank, how to calibrate a DP Transmitter? How is the floating roof weight considered?
hey any one got the papers of SAIL and HPCL plz do help me by posting them to my mail ID's naren07_87@yaho.co.in, surenarendra@gmail.com
WHAT IS THE CAM POSITION IN CONTROL VALVE POSITIONER ? WHY IT IS USED?
god evening sir i am studying m.sc(tech)electronics &instrumention.am i elegible to all industies
Explain the working of an enraf level gauge.
HOW TO CALCULATE ACCURACY OF AN INSTRUMENT. WHICH IS COMPITABLE FOR USE.
If a control valve is hunting means means if we are giving 50% to the cv, the cv will open at 51% then slowly slwoly it will reaches 49% , so what to do for solve this problem. The cv is double acting and mounted for anti surge operation, it having 4 nos. volume booster, one sov, one positioner, etc..?
what is isloted barrier how it works and what are the main purpose.how it make safe area.
How many interlocks at turbine? Plz explain briefly
what would be the minimum flow rate that we can measure on rotameter..?
how pressurize drum calibrated ?
hello sir/madam, I,Subramanian need 5yrs placement papers of officer trainee of Instrumentation technology.pls send to this mail id mani_nxtgen@yahoo.co.in please do the needful. with regards, subramanian.v
Why plc require in analog input 4-20amp & 0-10 volt?
Operational amplifiers
what step is taken for ESD ( emergency shut down) in DCS REPLY to hashimka20009@gmail.com