Please explain about FAT? What is the difference between
FAT and SAT?
Answer Posted / manoj
FAT = Factory acceptation test
SAT = Site acceptation test
when any company going to install new instrument control
system,they have to test how its working ? In the FAT shop
they will do configuration setting for all instrumet loops.
according to configuration the system providor will do
function test by simulating signals.
but during the SAT they will check all function with real
Input signals.
| Is This Answer Correct ? | 37 Yes | 2 No |
Post New Answer View All Answers
what effects a surging can produce in the compressor
what is zero and span ?
how to check earthing,what is minum ohms for proper earthing
how many types of spped sensors n vibration sensors?their basic principle n connection?
how to calculate control valve bonnet size?? or how to select its material?
Explain the mechanism behind the turbine meter.
1. For Steam drum level signal, why do we compensate with drum pressure signal? 2.For main steam Flow signal is comensated with main steam temperature signal and main steam pressure signal why?
plz send me general of ongc
Actual using of tube bender to bend 2 opposite 90 deg at correct measurement center to center of tubing.
How to Calibrate Vortex Flow transmitter in field
defination of radial vibration?
How to fix back the valve actuator stem
How process line mpm calculation is done?
Which Signal hart communicator work? If there any signal change when hart connect while transmitter in line ?
how works encoder in plc