On concrete surface 1sq.ft area hacking no's of hack?
Answer Posted / modipraveen
Its should not less than 1" to 1" for Sq.ft 144 no will come
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
Who built the sears tower?
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
What are the benefits of rcc pipes over steel designed pipes?
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
what is Brest Wall?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
What is the development length given in pile?
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
Which Types Of Bricks ?
List out the potential risk factors for workers on the construction site?