Moving Iron instruments are applicable with
a) DC only b) AC only c) DC & AC
Answer Posted / srinu
moving iron instruments are applicable for AC as well as DC
Is This Answer Correct ? | 19 Yes | 1 No |
Post New Answer View All Answers
what parameters are should nessary for control technic dc drive(in rolling mills)?
how hazordious area is classified at an oil & gas plant and categorise suitable class of electric equipment in that area like induction motors, LCS, Lighting Fixtures Fluerescent/Flood lights Mercury& sodium lights, J.Bs, Power Cables etc
If a high resistance fault occurs,then what are the changes will happen in the system?
please tell me when we start motor without load in star or delta connection whose current above condition,pl write formula
Dear Sir/Madam, I have one questions we have three steam turbines and one Gas turbine and our industry linked with the public network, we have protection system one of the protection is reverse power we can export just four MW only i would like to ask about how to calculate the reverse power. Thank you in advance best regards
sir my exam is on 19/6/2013 under electrical branch pls send me sample aptitude questions as well as sample technical questions for jindal steel and power company
my name is venkat .i have good percentage in my academics(ssc 86, intermediate 83 b.tech 73) my question 1..after completion of my ssc i joined in bpc but i didnt got rank in emcet so i completed MPC in one year compartmentally ..so here what am expect question from this background?
Between educational qualification and practical work experience, give us a brief explanation on your practical experience in your past Endeavour that you performed well to the satisfaction of your past or present employer?
what is the clear formula to calculate cable size for a load
what is mean by Digital Logic Meter (DLM)
What was your role in the silicon evaluation/product ramp? What tools did you use?
How to calculate Air conditioning capacity for a telecom BTS shelter?
how we control automatic generator i'e with to supply (main supply and local generator) when the main supply was break to supply the local supply automatically to begin supplying power.I now this control circuit is the combination of contactor time delay contactor switch and overload relay .but my question is how we combine those component thank you
What is the importance of counter based plan & how is it scheduled?
what is Fault level? why it is calculated? how will u decide same for our plant?