Answer Posted / mitul
118*
| Is This Answer Correct ? | 40 Yes | 3 No |
Post New Answer View All Answers
What is the formula to determine the speed of induction motor?
Which element is added in steel to increase resistance to corrosion ?
How many types of fits are there?
Give the safety precaution when working in a high place.
Steps In starting boilers.
Why would you use pneumatics?
What is forced convection?
How to start water tube steam boiler
HOW TO calculate steam velocity on boiler o/l ?
What is 1810 stainless steel?
based on the recruitment program and the expected resumption date
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
Please brief me about Ball-screw.
Define nusselt number [nu].
book name for the written test of rrb exam