Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is mean by super structure?

Answer Posted / asheesh

the structure above 1.2 mts high above normal ground level

Is This Answer Correct ?    1 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to tie 10 legged stirrups

6479


Why the finite element method is lower bound solution?

2900


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

2209


What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?

2269


What is the difference between absorption & adsorption and sorption?

1137


Explain the water bound macadam roag

2646


How to activate isometric axes in cad?

1164


what is shuttering co efficient?

1806


How foundation is designed, Column design and beam design

2268


Permissible wastage of cement as per IS code ? In which IS code I get it?

1708


If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?

1646


Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.

2353


why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?

3152


Different sizes of Hollow blocks and its weight. Thanks.

2380


How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?

2268