Answer Posted / iamdon
Hot resreves- Power plant available with thermal process in
operational readiness.
Spinning reserves- Power plant conected to bus and is ready
for taking loads(if any)
Author:arbelectbit@yahoo.com
| Is This Answer Correct ? | 11 Yes | 2 No |
Post New Answer View All Answers
explain wiring system
list the type of vfd? wich is sutable for heating kiln?
How can i calculate the Breaking capacity of molded case circuit breaker, is the breaking capacity of CB for Diesel generator shall be less than grid supply's breaker ?
what is the maximum permissible limit value of leakage current and leakage counter reading to replace lightining arrester?
What happen when change order of CT in GIS feeder?
How many types oil using in transformer ? How many letars using in transformer..?
Explain what cmos is and its benefits?
what is the illumination level required for child play area?
1 “earthing” for bonding of equipment and circuits to common plant earth electrode potential, 2 “protective earthing (PE)” when this bonding is required for personal safety provisions 3 “grounding” for interference suppressing bonding of screens, sys-tems with ground level 4. low-impedance earthing ? 5.primary earthing system and secondary earthing system what is that? 6.earthing electrode or mesh net earthing electrode ? very confusing , simple but very informative help required ? i will be very very thankful to you guys.
hi plz send me reliance placement papers..i.e electrical technical papers that have been asked in reliance test.
Please clarify 1. Icw: rated short circuit working withstand capacity 2. Icu: Rated ultimate breaking capacity 3. Ics: Rated service short circut withstand capacity 4. other specification of ACB
how to discharge 3 phase power factor correction capacitors
In Generator How suction compression power and exhaust works ?
A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.
What is real time power factor control panel(RTPFC)?