Answer Posted / iamdon
Hot resreves- Power plant available with thermal process in
operational readiness.
Spinning reserves- Power plant conected to bus and is ready
for taking loads(if any)
Author:arbelectbit@yahoo.com
Is This Answer Correct ? | 11 Yes | 2 No |
Post New Answer View All Answers
The advantages of Magnetic flux leakage technique over Ultrasonic technique for non distructive testing of material.
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF Govt Polytechnic in deee 2nd year papers
A 2083kva AVR was tested, phase to ground shows continuity, what is the implications
WHAT DO YOU MEAN THE DIFFERENT TYPE OF CURVES OF RELAY LIKE STANDARD INVERSE, VARY INVERSE, NORMAL INVERSE, LONG INVERSE ETC....
Why open circuit test of transformers is conducted at rated voltage??Why not any other voltage??
Difference between low impedance and high impedance Restricted Earth Fault
What kinds of decision are made about CT from it's Knee point(voltage & current)?
what is the difference b/w ground & virtual ground?
What do you mean by a phase angel of instrument transformer?
how we control automatic generator i'e with to supply (main supply and local generator) when the main supply was break to supply the local supply automatically to begin supplying power.I now this control circuit is the combination of contactor time delay contactor switch and overload relay .but my question is how we combine those component thank you
What is the cut-off rate?
Its possible to use 3core 2R of 240 sq.mm cable for 3phases & separely 50sq.mm 3core cable fully for Neutral for connection of PCC to MCC 3ph..4wire system?
why transformer ratings in kva? & DG ratings in kva? & Motor ratings in kw/HP?
bsec exam syllabus (mis)
how to measure dc earth leakage current?