Answer Posted / iamdon
Hot resreves- Power plant available with thermal process in
operational readiness.
Spinning reserves- Power plant conected to bus and is ready
for taking loads(if any)
Author:arbelectbit@yahoo.com
| Is This Answer Correct ? | 11 Yes | 2 No |
Post New Answer View All Answers
Between educational qualification and practical work experience, give us a brief explanation on your practical experience in your past Endeavour that you performed well to the satisfaction of your past or present employer?
Please give me a erda placement paper
i want to know that how the height of Ct ,cvt ,LA calculated on the basis of creepage distance
please tell me when we start motor without load in star or delta connection whose current above condition,pl write formula
What is the use of lag compensator?
how to choose cable size with respect to load? how to convert cable size in mm2 to sq.mm?
HOW TO SELECT THE COPPER CABLE SIZES OF MOTORS,TRANSFORMERS?
State superposition theorem?
Dg pf .71 i am improve pf 0.80 what capacitor connected in dg how?
the site measured knee point voltage of protection class CTs should be greater than rated knee point voltage? what about meetering class CTs. Should it be below the rated knee point voltage?
what will be d.g. capacity to cater together for 14hp A.C. load & 3kw lighting load
Can i use the B-curve MCB instead of C-curve MCB
I have two PLC processors. I want to communicate both processor with each other. How i can do so?
how we explain parallel paths armature winding?
Difference between control junction box (cjb) and power junction box(pjb)?