Answer Posted / kubes
7018=
70=tensile strength 70000psi
1= welding position (all position
8=current flux
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
What is a converter reactor ?
What is brain of the computer?
Name the different shops?
what is the difference between set up of cast iron manufacturing industry and steel manufacturing industry?
What is the congressional space medal of honor?
Hi i am riyaz ahmed . i got rejected for first time and i nedd to apply for next time and can i apply in 1 or 2 week . and wt abt my sevies fee ? i should make a new once shill i go with the same and wt docement i should change can u plz help me out and my mail it is royalriyaz@gmail.com
Define earth lamp?
How will you size a pipe?. What is Darcy's formula?. From where you will get friction factor "f" ?. In darcy formula substitute f = 16/Re and now you see hf proportional to V instead of V square. How do you explain?.
What is add number
What pressure is highest L.O. Gravity Head or S.W. of the stern tube circulation
Why high latent heat of vaporisation is desirable in a refrigerant ?
what is the effect of throttle pressure on turbine efficiency?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
what is mean by cc critical characteristic, hic high impact characteristic
What are the different types of brakes and explain them?