What is Soil & Whats the type of soil are there?
What is Ultimate & safe stress?
Answer Posted / aung
Soil is the fragment of rock. mainly two types, clayey and
sandy soil.
Ultimate stress is the stress to failure and safe stress is
reduce ultimate stress by safety factor.
Is This Answer Correct ? | 26 Yes | 5 No |
Post New Answer View All Answers
in 100 cft = 1350 bricks in 100 cft = ? bloks
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
What is meaning of tlc
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
strength vs shape factor
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
When column of building is abutting the boundary line,then suitable footing advised is
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
How to find the cuplock pipe qty in staging for Minor bridge?
what is civil engineer greatest strength and weakness?
What things architect have to take care of before starting any project?