Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Laboratory experiments conducted in Mumbai on a particular
mix showed a
strength of 33 MP a for a fully matured concrete. Find
whether formworm
can be removed for an identical concrete placed at Jammu at
the age of 15
days when the average temperature is 60C. The stripping
stress in concrete

Answer Posted / buntychandwani

First thing the question is not completely and correctely
typed. The stripping stress in concrete in missing and also
how 60 deg temp will be possible in Jammu & Kashmir.
Let us connsider the Stripping stress of concrete as 25 Mpa
and average temp is 6 deg.

Now,

Maturity = Submission (time x temp)
= 15 x 24 x [6 - (11)]
= 6120 deg CH

Plowman's Constant given as A = 21 and B = 61


Se/S 15 = A + B Log10 [ M /1000]

Percentage of strength = 21 + 61 log(6120/1000)
= 68.99

The strength of Concrete at 15 days = 33 x (68.99/100)

= 22.76 Mpa

Since the strength of concrete is less than the stress to
which it is likely to be subjectd while stripping the
formwork, the concrete may fail. Therefore, the formwork
cannot be removed at 15 days time.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

as per is code, what is the minimum content of opc and ppc cement for rcc structure

2324


How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?

2378


sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience

2525


For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?

1854


in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?

2047


What is gravity flow?

1256


Formula of mid span bar

1993


What is reinforced concrete?

1165


Is there the dry coefficient of cement is constant?

2329


WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT

2670


hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having

2579


For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)

2113


Can we use the flyash bricks in brick bat coba?

1585


I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?

2162


What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?

2160