what is the meaning for 'prime cost' in civil construction
contracts?
Answer Posted / jayavijayan k (ivrcl)
While working out the abstract for a job, it is not always
possible to define everything necessary for the completion
of the building. For example, certain items such as water-
supply fittings, plumbing fixtures, etc, are to be decided
by the Architect, later on. Hence it is not possible to
work out the cost of such items at the time of inviting
tenders. So a lumpsum provision is made for these items. It
is called PRIME COST Provision, and is subject to
adjustment against actual items selected later.
| Is This Answer Correct ? | 29 Yes | 3 No |
Post New Answer View All Answers
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
The definition of national highway
what is the hanekom repairing material after concreting work
What is the maximum strength of cub compress strength in one cub testing
how to calculate the scour depth
How do you calculate the power of a centrifugal pump?
what is the percentage of silt in black cotton soil.?
Critical Path Method is...
What is the strength of 1:6:12 mix?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
Define What glue is least sticky?
How to do base isolation for RC framed structure using ETABS software?
What do you mean by tolerance factor of concrete ?