How to calculate labor requirement or requirement of labor
projction for a proposed multistoried building for which
quantities of different items of work has been already
calculated stage wise ?
Answer Posted / binu
Labor requirements can be availed from fidick or any estimation books also historic data can help in ascertaining the same
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
What is the diameter of the 3"inch nails?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
what is civil enginnering & what you need of this course?
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
Reinforcement details at hinged joint
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
How much for the BRC lapping in full yield and half yield < and which table to get it ?
What things architect have to take care of before starting any project?
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40