Answer Posted / shariff
This voltage is just like a diode knee voltage in CT, but at a specified rated current of the primary that CT after which the secondary will be constant irrespective of the changes in the primary.
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Why PT voltages are measured with respect to ground? What do u mean by voltage or current polarized.
What is the function of the generator exciter?
In how we connect watt meter for open & short circuit test of a single phase transformer.
Can you explain about TEE protection scheme?
I have made a 3 phase thyristor full bridge rectifier. But at the moment it is working only for the half bridge operation. Both the half bridges are on operation separately but when i put it into full bridge operation the oscilloscope output is zero. I rechecked that the pulses are correct for each thyristor. what could be the possible reason for this?
Draw the DOL starter and star delta starter drawing?
placing earthing pit in pathway is correct or wrong??. placing earthing wireGI1/18 inside walls is correct or wrong?. explain!!!
How can you calculate the size of the down conductor cable for the lightning protection system. Is 70mm2 cable can replace 95mm 2 bare copper cable when the copper tape size is 25Wx3 thk mm.
What does the a,b,c of 95a,95b,95c relays denotes?
If you don’t have coal, salt and copper, then how would you earth your connection temporarily at a camp site.?
what is the minimum pay scale for electrical engineer (building construction)in kuwait? plz revert back with yrs of experience & pay scale respectively.
How to calculate impedance volt in Transformer?
how to calculate sizing of NGTR (Transformer rating,Loading resistor value and Current rating of resistor) and what is the X/R ratio. Details : 11kV,Capacitance 1.73532 micro farads,40kA for 1sec.
Hi.. I am a BE GRaduate in E&E. I have 8.5 Experience in Tendering & Estimation field. I have done SAP SD course few years back. But due to some reason i failed to get job in that field and continued my own field. Now I am thinking of changing into SAP seriously. How should i go ahead???
What are the advantages and disadvantages of closed-loop control system?