Cost control in civil construction as well as Quality control

Answer Posted / vijender kumar

It is depend on the market conditions. what is the
customers needs & requirments. most of the people want to
utilize the resources at a minimum cost.behalf of the
organisation it is very importent to cost control with
average quality.this treatment will increase company's
profit at higher level.
On the other hand quality control is also very
determine.consumer is not blind, he demands for good
quality product which is purchasing by him, & he could pay
little more for it.
so atlast, customer can compromise with cost somewhere but
he can not that much compromise with the quality.

Is This Answer Correct ?    4 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?

1558


what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?

1631


States some of the commonly used commands in cad software’s?

758


how to calculate testing date

1228


a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.

12677






can any one explain bar bending schedule of bems and columns and slabs ??

1408


how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress

1376


What are the ingredients of pre-stressed concrete?

769


how will remove spiderweb cracking in plaster ? what the reasone of make it ?

1505


What is the meaning of soil reinforcement?

663


Who built the sears tower?

634


Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete

2009


In jack arch floor, the rise is kept?

708


I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2

1801


any book or article on pumped concrete.

1726