Cost control in civil construction as well as Quality control
Answer Posted / vijender kumar
It is depend on the market conditions. what is the
customers needs & requirments. most of the people want to
utilize the resources at a minimum cost.behalf of the
organisation it is very importent to cost control with
average quality.this treatment will increase company's
profit at higher level.
On the other hand quality control is also very
determine.consumer is not blind, he demands for good
quality product which is purchasing by him, & he could pay
little more for it.
so atlast, customer can compromise with cost somewhere but
he can not that much compromise with the quality.
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
what is the use in canals of longitudinal drains and cross drains in lining areas?
what does the track parameter mean in staad.pro?
where i can get material costs on weekly basis
What will you do if a portion of load bearing wall collapses under your supervision?
What is soil enforcement?
Which ratio use for cement selery???
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Define What is unit weight of normal concrete?
how to calculate the steel in 500yard
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
how we calculate the vol.of wet concrete..?
What happens to Load at yielding ?