Answer Posted / nisha
poissons Ratio is the ratio of Lateral strain to the linear
strain.
For steel it is 0.4
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
How to determine thee cut length for steel reinforcement bars in R.C.C design
what's the formula for calculate pcc for matt(45mm aggregate)?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
what is the difference between prime coat and tack coat in road construction
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
cement and sand required for one block of size 0.23*0.15*0.46
What are advancements in civil engineering?
how to calculate the size of triangular ring in rcc column?