If the 11 KV supply is fail. what will happened with it's
breaker if it is supplay to the 11KV motor?

Answer Posted / sandipan

11KV motor'breaker will be tripped in U/V automatically

Is This Answer Correct ?    5 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

typically in power distribution substation. 1- Any idea how would be the graph of capacitor bank consumption verses time through the day . 2- How is the switching ( on and off ) of the capacitor bank, per need?

1299


best manufacturer for busbar for outdoor switchyard having double bus bar scheme, can any one share technical specification of busbar. 132kv voltage ?

1252


L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.

675


What is the name of transformers oil filteration equipment?

1593


WHERE NEUTRAL WIRE IS CONNECTED AT DOMESTIC TO TRANSMISSION LINE(SINGLE PHASE TO THREE PHASE)

1347






Define steady state error.

648


I'm generating a pulse of 3V with frequency 80Hz (12.5ms time period) and pulse duration 0.125ms and feeding it to a transformer since i want the pulse to get amplified around 60V. At the output amplification s happening but the pulse is changed to a spike, can you tell me what could be the reason? (an ordinary transformer 220V-12V stepdown transformer is reverse connected ie. now it is 12V-220V stepup and voltage amplification happens)

1453


what is the purpose of shading ring or shading coil in electrical equipments.

3965


Why the efficiency of generator is more than motor in swinburne's test

1577


What is the transfer function?

626


What facility we get after CT secondary earthing and how?

1725


I COMPLITED MY B.TECH AND 10TH CLASS WITH 70%MARKS BUT 12TH CLASS 55%MARKS..CAN I GET INDIAN RAILWAY RECUREMENT EXAMINATION?

1724


How maesure earth neutral value & how much maximum value value required in between earth & neutral.

1592


sugest any typical project ?

1377


In control room of our one plant there is a continuously the incoming power goes to PC is vary,means in stabilizer it continuously indicate from high input to low and low input to high. what is the reason and its solution.

1503