1.DIFFERENCE BETWEEN NOMINAL MIX AND DESIGN MIX?
2.WHAT IS MEANT BY STRUCTURAL DESIGN?
3.IN STAAD WHY WE RELEASE MOMENT TO A MEMBER?
4.ON WHAT BASIS PARTIAL FACTOR OF SAFETY ARE DECIDE?FROM
THE LOAD COMBINATION?
5.WHY WE PROVIDE EXTRA BAR & DEVELOPEMENT LENGTH AT TOP?
6.FULL FORM OF SPT & SMB?
7.WHAT IS MEANT BY ITP IN A CONSTRUCTION PROJECT?
8.WHAT IS LEAST COUNT OF THEODOLITE SURVEY?
9.WHAT ARE THE CAUSES OF FAILURE OF FOUNDATIONS AND
REMEDIAL MEASURES?
10.WHAT ARE THE VALUES OF COMPRESSIVE STRENGTH?
11.STEEL CALCULATION FOR FOOTING,BEAM & SLAB?
12.WHAT IS MEANT BY GANTRY GIRDER?
13.IN SITE HOW WE CAN IDENTIFY THE ONE WAY, TWO WAY SLAB?
14.DIFFERENCE BETWEEN ANCHORAGE LENGTH & DEVELOPEMENT
LENGTH?
15.BEARING CAPACITY OF STEEL SHUTTERING?LOAD CARRYING FOR
SHUTTERING?
Answer Posted / s c jayakumar
1.Nominal mix is standard mix formulated by BIS comittee
for construction use where as design mix is that,With the
optimum cement content and proprely graded/blended mix
constituents used to form rigid congolomarate for better
durability.Using of optimum cement content is to get
economic construction without compromising of durability of
structure.
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
construction workers how much time take one work or qty
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
What is the diff between cad & cadd?
what is thumb rule for calculating the size of ISMB required for a particular length of span
how statics is different from dynamics
What is an ortho mode?
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
how many type of admixtures for water stored structure?
how much to get of BRC lapping in full yield and half yield ?
what will happen if one could not properly follow the spacing of slab reinforcement bar?
How to design staircase.plz tell me formula for the design the staircase.
What is aggregate?
in 100 cft = 1350 bricks in 100 cft = ? bloks
List out some of the common problems that architect have to tackle it?