Cost control in civil construction as well as Quality control
Answer Posted / s c jayakumar
To control cost in construction proper utilisation of
resorces in time,to avoid wastage of resources,Proper
planning and Safety and Quality awarness of workmen as well
as staff.
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
What is construction mitigation management?
What is geopolymer based concrete?
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
crank types
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
punj loyed and sapurjl palanjl
what is stressing
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
How to compute minimum number of columns required for a site from area of site?