what is transformer
Answer Posted / hariharan
Transformer is a static device which is used for step up
and step down voltages without changing the frequency
| Is This Answer Correct ? | 11 Yes | 3 No |
Post New Answer View All Answers
What is the effect on power factor, shown by a trivector meter; incase of reverse phase sequence. If the power factor of a system is lag what meter will show in case of reverse phase sequence connected to the meter. and What in case of lead.
how to handle 2500 kva transformar
I have done my m.tech in electrical engg discipline. Can any one please suggest me how should I prepare for getting into phd in iit or nit.How should I prepare for getting into lecturership
What is the tube exial fan?
why not starting switch first connect in direct on line starter?????
What is electrical cable termination
hi i have applied for lic of india south cenrtal zonal ,hyd. i didnt get hall ticket till now.let me know how can i get form internet
we have an energy meter in a capacitor bank panel, So should we consider it's readings as energy consumption on daily basis. (when capacitor bank doesn't have any energy losses)
what is meant by IGBT how they differ from tyristor ?
can mini-curcuit supply MIL-tested transformer !
list of tests to be carried out at manufacturers end while purchasing a step up transformer of 11kv to 66kv ,2MVa Capacity.
WHAT IS MEANT BY INSULATION CLEARANCE IN VACCUM?
what is the difference between droop mode and ischnorous mode in thermal powerplant?
If a shunt Dynamo has induced emf 100V and 0.4 ohm resistance and battery of accumulator of open circuit emf 110V and 0.5 Ohm resistance are in parallel what is common terminal potential difference?
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram