Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

4-Why we measure the insulation resistance of main core and
frame in spite of that must be connected with ground

before energize the transformer?

Answer Posted / mrudang

the 2 nd answer is quite right ,

actually we have to know the value of core insulation
its resistance , for its condition ,we have the standads
for it , and match with those value

if there is leakge current , the value should be lesser
we are doing between phase- earth , and phase to phase
so we match the phase to phase value also

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the conditions to be satisfied for parallel operation of dc generators?

1036


if the number of poles generated in stator and rotor side of an induction motor are different then what will happen and why?

1826


what is v/f control in VFD?

1487


Is any generator is developed which is operated with out diesal or other expensive source?

2062


What is the accepted limit to increase the choosen transformer capacity over the load and why ?

3465


bsec exam syllabus (mis)

1224


What is earth?

2354


what is a pilot wiring and whys that called a pilot wiers

1857


how to estimate wiring ins roughing ins. and boxes

2342


how was your last weekend.

1745


What is ramp signal?

1055


Why DG set is not installed in Terrace ??

930


what is the correct method for the outdoor termination of 19/33 KV HT cable step by step?

2016


I Just want do EHS Certified Certification Distance Course From Govt approved,so can any body provide me details.

2086


If mutual flux is 1.2wb & power factor is 0.8 lag , then what is the Useful flux of a transformer?

4433