How the soft starter control the starting current in three
phase squirrel cage AC Motor?
Answer Posted / hamed
Soft starter means useing auto-transformer to increase the
voltage gradually till it reach full speed.
Is=Voltage/sqr.root(X^2 + R^2 ),
So it is clear from the formula that the Is is small when
the Voltage is small.
| Is This Answer Correct ? | 3 Yes | 5 No |
Post New Answer View All Answers
whatis the commertial spec. of distribution boards ?
in a solar power plant,we are going to step up the voltage 350V to 33kv, and to 132kv GSS. i want to ask that if it is possible that 315v/33kv is not possible because we also use 315v/11kv. or it should be 415v/33kv? is it effects generation or losses? the second question is-generation is depends on LV winding? or LV winding design for generation voltage?
Give idea about General Engineering. From which book i can study this topic. Pl. reply me via email. My email is ravi@bhelhwr.co.in, also give the name of book/website, from where i can prepare it.
ratings of lightning arrester
Difference between shunt, PMG and AREP excitation. Which is the most reliable between PMG and AREP.
What does the term “voltage regulation” means?
how the speed of the gets motor regulated. does it draw the same current on the all speed level.
Why wind turbines wheels rotate constantly
A 400 V, 50 Hz, Δ connected synchronous generator has a field reactance of 0.1 Ω and armature resistance of 0.015 Ω. At full load, the machine supplies 1200 A at 0.8 pf lagging. Under full-load conditions, the friction and windage losses are 40 KW and the core losses are 30 KW. What is the machine’s overall efficiency? Ignore any field circuit losses.
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
PLEASE SEND ME NTPC RELATED INFORMATION LIKE WHICH TOPICS HAV MORE SCOPE,BOOKS TO READ,CUT OFF...PLEASE.mail at thiru.1203@gmail.com
IN 1000kva transformer where the oil and winding temperature sensors is connected
what will be the effect if you were using different brands of outlets?
Explain the advantages and disadvantages of thermal power plant?
Explain the different methods used in the choice of rotor slots for reduction of harmonic torques in an induction motor.