Answer Posted / sunil guru
B.E--bachler of engineers provided by all gov. collages
but B-tech is provided by only selected self financed collages(SFC) (deened collages)
SFC-- organise the course & syllubus accordingly by self(with emerging technology )...
i.e no interruptions from outsides.....
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
suri transmission
Form S and "c" license application both are same? @ tneb portal
please give me all the Alarm .Trip ,Safety Relays & Conditions of Chiller mail me on ashokbabunhce@gmail.com
i need to now what will be the cable size to the following load, transformer to distribution panel distance 110m, load 1000kw, voltage 400v, pf 0.85, permissible voltage drop 2.0%, overhead line, atmospheric temperature 35 degree c.
IF I KNOW THE AREA OF CROSS SECTION OFTHE WIRE , WATTAGE OF THE LOAD ,VOLTAGE SUPPLY WHAT IM GIVING TO THE LOAD AND ALSO POWER FACTOR OF LOAD ....... SO GIVE ME FOR WHAT AMOUNT OF CURRENT I SHOULD USE WHICH TYPE OF CABLE?
What is the complete procedure of erection of electrical panel in industry
Hi Everyone ! My Name is Hakim ullah khan please i need formula of Cable Rating because i want to calculate by self without check any Table Chart... Thank you.....
is it possible for different brand of H.V transformers to run or operate in parallel to each other? if so how much disturbance can this affact the H.V bus bar?
HOW TO CALCULATE S/C,O/C,E/F OF ACB.
1.What is the range of stator resistance of 3-phase induction motor? 2.Two electrically operated vibro motors are foxed in parallel direction in vibrating feeders. what is the direction of both vibro motors?
Pl. give me checklist for installation & commissioning of machine tool.
how is the cable tray designed & how its total length is calculated for an Industrial plant Say for Ex. (500KW Motor Load)
how did i get the competency certificate as electricle supervisor. iam completed my b.tech.but i dnt have any experince, this certificate is required for applyng ongc mangement trainees. what should i do sir please suggested me
What is transient response?
What is the important precuations need tocarried out while working with Electrolite in Battery PM?