Why do we use steel in Column?
Why HYSD bar is preferable than plain bar?
Answer Posted / ajay
1 we know that steel is better compression member than
concret as column is a compression member so we use steel
in column .....
2.since bond stess of hysd bar is 60 % more than mild
steel bar and also in compression the bond strength is
increased by 25%.
Is This Answer Correct ? | 5 Yes | 32 No |
Post New Answer View All Answers
what radial pressure, the NP2 class rcc pipe can sustain?
how much cement and sand required for 1cum rr masonry
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
For what purpose bedding is used under storm water drains?
what"s the sort of beams?
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
What is specific gravity???
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
What is the difference between Fe 500, Fe 500 D and Fe 515.
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
Define What happens to Load at yielding ?
Which architectural movement is also known as jazz moderna?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.