Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / mohd.younus ali , je (pr )
Top Length = L1
Bottom Length = L2
Top Breadth = B1
Bottom Breadth = B2
Depth = D
Then simple formula is
(L1+L2)/2=L
(B1+B2)/2=B
The Quantity of Concrete is = L * B * D
| Is This Answer Correct ? | 16 Yes | 51 No |
Post New Answer View All Answers
how is the reinforcement is distributed in triangular slab
How to find permissible diagonal tensile stress in reinforced brick work
How much 1 cum of M15, M20 & M25 concrete weigh?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
how to calculate valuation for the old building?
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
Explain the latest method to detect a crack in a building?
What is kn measurement?
what is your role of in previous company as a construction manager
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
The concrete slump recommended for beams and slabs; is?
How to compute minimum number of columns required for a site from area of site?
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
Scaffolding IS code NO.